Sunday, September 30, 2012

Hour Log - Second week of school

This week at work I spent all my time on the one 7420 I started on last week. I ended up rewiring the right fan/inspection belt tower. Then pulled two of the main hydraulic hoses that were leaking and then changed one of the wheel drive hoses. Then I pulled the flight belts and replaced the bearings on the flight belt drive shafts.

School hours 12 hours
Work hours 28.38
Week total 40.38
Quarter total 85.16

Tuesday, September 25, 2012

Saturday, September 22, 2012

First week back in school

Well the first week of school is over now. Its been good to go over the electrical stuff again because now a bunch of it makes more sense to me because I have been working with electrical on the harvesters all summer.

This week at work I finished a rebuild on a tractor transmission and then  put the tractor back together. Did some work on a old LP gas McCormick, mainly stopping oil leaks. And then started on a 7420 Oxbo harvester. This harvester is the prototype 7420 so it has been around for a bit and has a few problems...I'll be putting in a few hours on it.

School hours 9 hrs
Work hours 35.78 hrs
Quarter total 44.78