This week at work I spent all my time on the one 7420 I started on last week. I ended up rewiring the right fan/inspection belt tower. Then pulled two of the main hydraulic hoses that were leaking and then changed one of the wheel drive hoses. Then I pulled the flight belts and replaced the bearings on the flight belt drive shafts.
School hours 12 hours
Work hours 28.38
Week total 40.38
Quarter total 85.16
Thanks Phil. Got some photos?
ReplyDelete